Structural
Warehouse Support Frame
A bolted and welded steel frame carrying a new mezzanine storage deck.
- Year
- 2023
- Client
- Logistics Company
- Location
- Namanve Industrial Park
The Job
What we built
A growing warehouse needed a second level for light storage without losing floor space. We fabricated columns, primary beams and bracing to the engineer drawings, all welded in the shop and bolted together on site.
The frame was hot dip galvanised for a long service life in a busy, dusty environment, then signed off by the project engineer before the decking went down.
Project details
- Material
- Structural mild steel
- Finish
- Hot dip galvanised
- Footprint
- 180 square metres
- Build time
- 6 weeks