The Job

What we built

A growing warehouse needed a second level for light storage without losing floor space. We fabricated columns, primary beams and bracing to the engineer drawings, all welded in the shop and bolted together on site.

The frame was hot dip galvanised for a long service life in a busy, dusty environment, then signed off by the project engineer before the decking went down.

Project details

Material
Structural mild steel
Finish
Hot dip galvanised
Footprint
180 square metres
Build time
6 weeks